Landfill Raw Leachate Treatment Project
Treatment Capacity: 200 m³/d
Process Flow: Biochemical Treatment + MBR + Two-stage DTRO
Project Overview:
This project targets the treatment of leachate from a landfill in Zhejiang to meet discharge standards. It adopts the core technology of two-stage DTRO to treat raw leachate. The permeate finally meets the discharge requirements, and the concentrate is recirculated and irrigated to the landfill area for centralized treatment. The system features a high water production rate.