High Concentration Spiral RO Membrane Element / CPRO
Technical Parameters
| Model | CPRO-50 | CPRO-90 | CPRO-120 | |
| Membrane Area(ft2/m2) | 376(35)±3% | 365(34)±3% | 345(32)±3% | |
| Design Flux (GPD/m³/d) | 10500(40)±15% | 9500(36)±15% | 12000(45)±15% | |
| Salt Rejection (%) | 99.5% (min. 99.0%) | 99.5% (min. 99.0%) | 90%~95% | |
| Operating Pressure(bar) | 10-50 | 40-80 | 60-100 | |
| Max Operating Temp.(℃) | ≤45 | |||
| Continuous Operating pH Range | 2-10 | |||
| Customizable Sizes | 2540/4040/8040 | |||
Application Scenarios
- Industrial wastewater recycling: Carry out deep purification on different types of manufacturing wastewater to generate reusable process water, lessening fresh water consumption and overall sewage outflow
- Municipal water reclamation: Reprocess biochemically treated urban sewage to supply non-drinking recycled water for landscape irrigation, street washing and toilet flushing
- High-fold concentration for saline wastewater: Concentrate high-salinity waste liquid from chemical and electroplating sectors to shrink its volume, which helps decrease expenses for subsequent evaporation and crystallization
- Electroplating water recovery: Concentrate electroplating rinse effluent to reclaim heavy metals; the filtered permeate can be circulated back for workshop rinsing
- Power plant concentrate minimization: Re-treat reverse osmosis concentrated brine from power facilities to boost water recovery and limit concentrate discharge
- Polishing treatment for landfill leachate: Further advanced purification after the secondary treatment of landfill leachate

Related Knowledge
Operating Precautions for Membrane Modules
During startup, shutdown, cleaning and other operations, sudden changes in pressure or crossflow velocity to spiral wound elements shall be avoided to prevent potential membrane damage. For startup, we recommend the following procedure to bring the system gradually from standstill into operation:
- The feed water pressure shall be increased gradually within 30~60 seconds;
- The designed crossflow velocity shall be reached gradually within 15~20 seconds;
- Permeate produced in the first hour shall be discarded;
- Once the membrane element is wetted, it shall be kept wet at all times;
- The user shall be liable for damage to elements caused by incompatible chemicals and lubricants;
- The maximum allowable pressure drop for a single pressure vessel is 50 psi (3.4 bar);
- Backpressure on the permeate side must be avoided at all times.
Warranty Period
The company warrants the performance of membrane elements for three 3 years. The three-year warranty period shall commence on the earliest of the following dates:
- The date when the reverse osmosis system is put into operation;
- Six 6 months from the date the membrane elements are shipped from the manufacturing site;
- Three 3 months after the membrane elements are shipped from Guangzhou / Shanghai, China to Taiwan of China, Japan, South Korea, Thailand, India, Malaysia, the United States and other designated locations in China.
Hot Tags: High Concentration Spiral RO Membrane Element / CPRO, China High Concentration Spiral RO Membrane Element / CPRO manufacturers, suppliers, factory, Acid Resistant RO 8040, BW 8040, ro membrane low fouling module, ro membrane pressure driven module, ro membrane skid mounted system, spiral wound membrane skid mounted system







